Servicezet: Health and Hygiene Specialist
Book free consultation
SZ-C03

Project Cleaning

Post-construction and post-renovation clean-up that removes dust, paint, cement and debris so new spaces are ready for handover.

Free consultation · price confirmed in writing before we start

BEFORE: dust & debrisAFTER: handover-ready
Time on site1 to 3 days depending on size
Team5 to 15 cleaners + supervisor
Ready to useOn handover
RepeatOne-time, at project completion

What's included

  • Removal of construction dust and debris
  • Paint, cement and adhesive spot removal
  • Window, frame and glass cleaning
  • Fixture and fitting cleaning
  • Floor scrubbing and finishing
  • Final handover-ready inspection

Ideal for

New offices, shops and flatsAfter interior work or renovationBuilders and developers

Before we arrive

Work complete

Civil and electrical work finished.

Water & power

On at the site.

Access

Keys and access to every area.

How we do it: 8 steps

From building site to move-in ready, checked with you or your builder at the end.

  1. 1

    Confirm work is done

    Civil and electrical work checked as finished.

  2. 2

    Remove debris

    Construction debris removed; waste bagged.

  3. 3

    Vacuum dust

    Construction dust vacuumed from all surfaces.

  4. 4

    Paint & cement spots

    Paint, cement and adhesive removed with scrapers and safe removers.

  5. 5

    Windows & stickers

    Windows, frames and glass cleaned; stickers and film removed.

  6. 6

    Fixtures & fittings

    Fixtures, switchboards and sanitary ware cleaned.

  7. 7

    Scrub & finish floors

    Floors scrubbed and finished.

  8. 8

    Handover inspection

    Final check with you or your builder.

Good to know

Civil and electrical work must be complete, with water and power on site, before we start.

What we bring

  • Wet & dry vacuums
  • Single-disc scrubber
  • Scrapers
  • Ladders
  • Squeegees

Good to know

  • Work scheduled at your convenient time
  • A supervisor on site throughout
  • Safe removers for paint, cement and adhesive
  • Waste bagged and taken away

Safety on site

  • Gloves, masks & non-slip shoes
  • Colour-coded cloths per area
  • Power off near water
  • Ladders held by a second person
  • Kids & pets kept away

Download the Project Cleaning service guide

Two illustrated pages: what we do, step by step, and how to prepare. Handy to share with your family or facility team.

Download PDF

Questions about project cleaning

How long does project cleaning take?

1 to 3 days depending on size. Your exact timing is confirmed with the quote.

How often should I book project cleaning?

One-time, at project completion.

How is the price decided?

Every space is different, so we quote each job after a free consultation by phone, photos or a site visit, based on area, condition and scope. Scope, date and price are confirmed in writing before the visit.

What do I need to provide?

Water, power and a ladder at the site. Our team brings all machines, tools and products.

Which cities do you serve?

Kolkata, Delhi NCR and Mumbai, with our head office in New Town, Kolkata. Call or WhatsApp to check availability at your address.

Related services

Ask for SZ-C03 · Project Cleaning

Tell us your space and preferred date. We confirm scope and price before the visit.

Call WhatsApp Book